• <small id="y4qig"><track id="y4qig"><form id="y4qig"></form></track></small>

      <big id="y4qig"><address id="y4qig"></address></big>

          尤物tv.2722,一级毛片a女人刺激视频免费,四虎影视永久在线精品,夜色福利院在线观看免费,91视频免费看,色妺妺在线视频喷水,国产精品日本一区二区不卡视频,亚洲精品国产精品乱码不卞2021

          News

          Drilling of Hilong’s Comprehensive Technical Service Well Rajani-5 Starts

          Date 2016-03-23

          (March 23, 2016, Shanghai) Hilong Oil Service & Engineering Pakistan (Private) Ltd. successfully started an integrated service project to drill well Rajani-5 on March 21, 2016, with drilling fluid, directional drilling and bits services.
           

          The designed TD of Rajani-5 is over 14000ft, estimated bottom hole temperature(BHT) is as high as 170℃, the highest mud weight is as high as 14ppg. It is a rare deep and high-temperature well in Rajani block, giving extreme difficulty to drill.
           

          Hilong introduced UEPL with customized solutions of drilling fluid, directional drilling and bits in the 2nd half of 2015. After a number of technical exchanges and business trip to Hilong, UEPL released PO to Hilong to provide integrated service of well Rajani-5.

           

          Dai Daliang, senior vice president of Hilong Group and general manager of Oil Service Business said, “the Rajani-5 well is the first oversea integrated oil service project of Hilong, marking a big step forward on the part of Hilong towards becoming an integrated oil service supplier.”

          The Site of the Rajani-5 Well